- Home
- Search Results
- Page 1 of 1
Search for: All records
-
Total Resources1
- Resource Type
-
0001000000000000
- More
- Availability
-
10
- Author / Contributor
- Filter by Author / Creator
-
-
Alam, Md_Noor E (1)
-
Aqlan, Faisal (1)
-
Parikh, Pratik (1)
-
Radman, Azzam (1)
-
#Tyler Phillips, Kenneth E. (0)
-
#Willis, Ciara (0)
-
& Abreu-Ramos, E. D. (0)
-
& Abramson, C. I. (0)
-
& Abreu-Ramos, E. D. (0)
-
& Adams, S.G. (0)
-
& Ahmed, K. (0)
-
& Ahmed, Khadija. (0)
-
& Aina, D.K. Jr. (0)
-
& Akcil-Okan, O. (0)
-
& Akuom, D. (0)
-
& Aleven, V. (0)
-
& Andrews-Larson, C. (0)
-
& Archibald, J. (0)
-
& Arnett, N. (0)
-
& Arya, G. (0)
-
- Filter by Editor
-
-
& Spizer, S. M. (0)
-
& . Spizer, S. (0)
-
& Ahn, J. (0)
-
& Bateiha, S. (0)
-
& Bosch, N. (0)
-
& Brennan K. (0)
-
& Brennan, K. (0)
-
& Chen, B. (0)
-
& Chen, Bodong (0)
-
& Drown, S. (0)
-
& Ferretti, F. (0)
-
& Higgins, A. (0)
-
& J. Peters (0)
-
& Kali, Y. (0)
-
& Ruiz-Arias, P.M. (0)
-
& S. Spitzer (0)
-
& Sahin. I. (0)
-
& Spitzer, S. (0)
-
& Spitzer, S.M. (0)
-
(submitted - in Review for IEEE ICASSP-2024) (0)
-
-
Have feedback or suggestions for a way to improve these results?
!
Note: When clicking on a Digital Object Identifier (DOI) number, you will be taken to an external site maintained by the publisher.
Some full text articles may not yet be available without a charge during the embargo (administrative interval).
What is a DOI Number?
Some links on this page may take you to non-federal websites. Their policies may differ from this site.
-
Computer Server Industry is characterized by extensive test processes to ensure high quality and reliability of the servers. Computer Server Industry production systems utilize Configure-To-Order (CTO), also known as fabrication/fulfillment, strategy which provides an effective balance between demand and supply by synchronizing the flow of materials, equipment, and labor throughout the production process. In the fabrication stage, components or sub-assemblies are produced, tested, and assembled based on a projected production plan. They are then kept in stock until an actual order is received from a customer. In the fulfillment stage, final products are assembled according to actual customer orders. Assignment of products to test cells during the fulfillment stage can be a challenging task due to high quality requirement and limited resources. Current practices tend to assign products to test cells based on a specific criterion such as on-time shipment or maximum test cell occupancy, which can result in higher levels of energy consumption or delayed orders. This paper introduces a Deep Reinforcement Learning (DRL) approach to effectively assign servers to test cells considering a multi-objective reward function that combines multiple criteria. A proposed simulation model serves as the environment with which the DRL agent interacts, learning a policy that develops a test schedule for the products. The proposed approach is tested with a case study from a high-end server manufacturing environment. Sensitivity analysis is conducted to analyze the impact of the different values of the system’s variables on its performance.more » « less
An official website of the United States government
